DE-9950X Scheduled Power Maintenance
1 PM CET: Scheduled power maintenance is currently on-going in the datacenter affecting our 9950X systems. ETA approximately 30 minutes.
1:36 PM CET: The maintenance is taking longer than expected due to unexpected circumstances. It should be up ASAP.
15:15 PM CET: Power should be restored. The servers should be up shortly. We apologize for the delay in this matter.
1:36 PM CET: The maintenance is taking longer than expected due to unexpected circumstances. It should be up ASAP.
15:15 PM CET: Power should be restored. The servers should be up shortly. We apologize for the delay in this matter.
DE-9995WX-FRA-1 Outage on 18 Mar 2026 23:25:45 (UTC+01:00)
Resolved
11:17 PM CET: We are currently experiencing issues with the DE-9995WX-FRA-1 node. It is being investigated.
11:24 PM CET: We identified the root cause of the issue and the server should be back online. A network card failed in the system and our active-passive configuration failed to switch the uplink. We will need to schedule a maintenance period to replace the failed network card. Affected clients will be notified once this has been scheduled.
11:17 PM CET: We are currently experiencing issues with the DE-9995WX-FRA-1 node. It is being investigated.
11:24 PM CET: We identified the root cause of the issue and the server should be back online. A network card failed in the system and our active-passive configuration failed to switch the uplink. We will need to schedule a maintenance period to replace the failed network card. Affected clients will be notified once this has been scheduled.